The hourly workload of the mini excavator? How much earth can an excavator dig Release Date:04.18.2023 Views: 418 Many customers often ask about the hourly workload of a small excavator. In fact, it depends on the size of the machine. How much a shift can dig depends on the bucket capacity, working conditions (soil hardness), operator proficiency, throttle position, It depends on factors such as the working mode, the brand of the excavator, and the age of the machine. If there is no accurate data, the 250 excavator is usually more than 1,000 square meters.1. Detailed explanationTheoretical values are easy to calculate: the bucket volume of your vehicle, the ratio of the soil content to the stone content of your current project, calculate and then use the volume of the bucket volumeCalculated in proportion. There is also whether it is the real side or the Xuan side. If it is the Xuan side, the bucket capacity can be increased by 10%-20% appropriately, and of course it will be easier to do.Another thing is whether the truck is loaded with the rear eight wheels or four wheels. The loading position of the excavator should preferably have a high platform to save cars, fuel, and time.The capacity of 250 buckets is about 1 cubic meter, and it can reach 4-6 shovels in a minute, that is, about 300m³ in an hour. Conservatively speaking, the 2,500m³ easy-to-use car can dry up to 3,000 in eight hours.The 250 configuration bucket is between 0.1-1.2 cubic meters. According to the bucket configuration, excavator brand, operator proficiency, working mode, and throttle position, the loading capacity varies greatly. Generally, the workload per hour is 200-300 cubic meters. wait.How much earth can an excavator dig in a day.Answer 1 An excavator can dig 200 square meters of soil a day. The earthwork volume of an excavator is about 1500.Answer 2 An excavator can dig 120 cubic meters of soil a day under normal operating conditions. Answer 1220 If the excavator is calculated on an eight-hour shift per day, it can dig about 1500-2000 cubic meters of soil a day, depending on the softness of the soil and the driver's skills. level.Answer 2 How much soil can be dug by one excavator shift depends on the size of the excavator and the technical proficiency of the driver.How much earthwork can a 120 excavator excavate in one class?About 500 square meters of soil. How much soil an excavator can dig in one shift depends on the size of the excavator and the technical proficiency of the driver.How many cubic meters of concrete can be broken by one shift of 70 excavatorsAbout 1,500 cubic meters. Under normal circumstances, 70 excavators can dig about 80-100 cubic meters per hour, and a shift is about 1,500 cubic meters.How much soil can be dug by one shift of 0.6 square excavator.The excavation volume of a shift of 0.6 m3 excavator can generally reach about 40-50 m3 per hour. Calculated according to the 8-hour shift, a shift can excavate 320-400 m3 of earth. previous:How about importing small excavators from China next:buy mini excavator Latest Articles Understanding the Lifting Ca··· Does Kubota make a good mini··· Can a Mini Digger Fit Throug··· Guide to the use of small ho··· Size and specifications of m··· How much does it cost to buy··· Uses of small excavators Specifications,models and pr··· Ranking of the ten most dura··· Small excavator customizatio···